APPENDIX 1: THE WORKING PARTY

Membership

Terms of reference


APPENDIX 1:  THE WORKING PARTY

Membership

Active

  • Prof. Jack Betteridge (Chair), Eel Pie Island resident
  • Robert Bowcock, Architect, Eel Pie Island resident
  • Martin Brunt, Architect, Richmond resident
  • Donna Clack, Thames Landscape Strategy
  • Nigel Cutting, Head of Leisure Services, LBRuT
  • Jim Deasley, Architect, Eel Pie Island resident
  • Peter Francis, river enthusiast
  • Robert Hancock, river enthusiast
  • Yvonne Hewett, Thames Eyot resident
  • Colin Hunt, Twickenham Rowing Club
  • Tom Morden, Student, Richmond Tertiary College
  • Brian Parker, Chairman Twickenham Society and Chairman of Traffic and Parking Working Party
  • Jenny Pearce, Planner, LBRuT
  • Derek Plummer, Architect, Chairman Richmond Environmental Trust
  • Judith Strong, Arts Advisory Group
  • Rachel Tranter, Curator, Orleans House Gallery, LBRuT
  • Elizabeth Wood, Embankment resident and boat owner

Communicating

  • John Armstrong, River Thames Society
  • Christine Byron, Netscape
  • Ron Berryman, River Thames Society
  • Ken Dwan and Ted Leppard, Eel Pie Slipways Ltd
  • John Hatto, London Wildlife Trust
  • John Idon, St Mary's College
  • Janet Knox, Twickenham Town Centre Manager
  • Helen Montgomery-Smith, Eel Pie Marine
  • Eve Risbridger, LBRuT Tourism Officer
  • Loveday Shewell, Arts Advisory Group
  • Mark Thatcher, Francis Francis Fishing Club

[Top]

Terms of reference

The terms of reference of the Working Party are as follows:

1. To develop the concept of the Centre building as a community facility suitable for all age groups.  The minimum facilities to be provided will include:
   
 
1 local discovery and heritage centre;
   
2 facilities for youth;
   
3 small scale music and dance;
   
4 café and arts display area; and
   
5 support facilities for external performances/events.

The overall parameters to be assumed are a building of approximately 1,200 square metres in floor area and a total income from the development in the order of £50,000 per annum; and

2. To make recommendations to the Steering Group on the proposals for:
   
 
1

the physical requirements of the building, e.g. uses, floor area, storey heights, etc.;

   
2 the estimated costs of fitting out the facility;
   
3 the options for managing the Centre;
   
4 the likely programme of uses/events; and
   
5 the estimated operating costs.